We’ve reached the home stretch of construction! Every time we visit the site there is something new to see. Over the past week, the interior railings have been installed for both sets of stairs. We used 2×2 fir posts for the vertical detail and the carpenter did a great job with the install. In the kitchen, the appliances and quartz countertop have been installed. Next week the butcher block countertop will be added to the island. In the bathrooms, the plumbing fixtures have been installed as well as the glass shower door in the master. Throughout the house the baseboard, trim and door handle installation has all been completed. There’s a lot being done all at once and it’s great to see so much progress. We are scheduled to be finished within a week or two and we will be moving a week or two after that!