House 09

April 27, 2018

Progress on the house is moving full steam ahead! It’s amazing how each step makes the house feel more and more like home. On the exterior, the metal roof has been installed and siding will begin soon. On the interior, insulation has been installed and drywall will begin soon. We continue to review and finalize a few remaining interior selections including paint and flooring selections. Regarding paint, we chose a white color to use throughout the house, with a few black accent walls. Regarding flooring, the first floor will be concrete, and the second and third floors will be hardwood. The bathrooms on the second floor will be tile. We chose a black tile for the master bathroom and a gray tile for the hall bathroom. It’s bound to be another exciting few weeks ahead, so check back soon for siding and drywall progress!

First floor entry and dining room

First floor kitchen

First floor living room

Second floor entry to master suite

Second floor bathroom

Second floor bedroom

Second floor bedroom

Third floor

Third floor mechanical/utility closet

· HOUSE

about me

Hi! I’m Megan. I’m an enthusiast for all things simple, minimalist and monochrome (and most things that start with the letter ‘m’). Born in the midwest, I am now living the city life with my architect husband, Corey, and two young children. I started this blog to document the process as we designed and built our house. I hope you enjoy following along as we stylize and organize our new home!

contact me

simplecityhouse@gmail.com

Photo Projects

This error message is only visible to WordPress admins

Error: No feed found.

Please go to the Instagram Feed settings page to create a feed.

Copyright © 2025 · Simply Pro by Bloom Blog Shop.