During the last few weeks at the site, the slab was insulated and welded wire mesh was installed. We had a weekend of snow, which thankfully melted quickly and did not cause any delays. This week was very exciting as the concrete floor was poured on Monday and framing started on Tuesday! We have really enjoyed going to the site everyday (or multiple times a day) to check on the progress. Framing is the best part of construction and it is so fascinating to watch our design come to life!