We’ve reached the home stretch of construction! Every time we visit the site there is something new to see. Over the past week, the interior railings have been installed for both sets of stairs. We used 2×2 fir posts for the vertical detail and the carpenter did a great job with the install. In the kitchen, the appliances and quartz countertop have been installed. Next week the butcher block countertop will be added to the island. In the bathrooms, the plumbing fixtures have been installed as well as the glass shower door in the master. Throughout the house the baseboard, trim and door handle installation has all been completed. There’s a lot being done all at once and it’s great to see so much progress. We are scheduled to be finished within a week or two and we will be moving a week or two after that!


















And then there was drywall! In addition to the mudding, taping and sanding of drywall, the bathroom tile has also been installed. On the exterior, siding has finally begun! There’s a lot happening all at once and it’s quite exciting to see everything coming together. Interior trim was completed this week and interior painting will begin this weekend. If all goes well, painting and siding will be finished within two weeks and the hardwood flooring installation will follow. Stay tuned!